Little Church Construction Started

February 13 was a big day.  Actual repair on the Little Church started! The plan is to pull the walls of the Little Church in at the top about two to four inches depending on which buttress is involved. The cables installed inside the church will be used to accomplish that feat. Protruding from the outside of the church are large bolts.  As the nuts on them are turned, the cables will be tightened, pulling the walls together. Once that is done, the buttresses themselves will be strengthened by applying heavy plywood to the outsides of them.  Then the finishing touches of sheeting will be returned to the outside of the buttresses so they will look just like they did when the whole process started.   See the photos below.

~ Bruce Roberts and Jim Cunningham

LC-2017-1

LC-2017-2

 

LC-2017-3